LANGUAN-KCC Two-Component Epoxy Colored Sand Self-Leveling Flooring is a 100% solid, solvent-free, zero-VOC system with high compression and wear resistance. It forms a seamless, dust-proof surface with excellent chemical resistance to acid, alkali, and oil, available in rich color options with either smooth or slight anti-slip finish; conductive type can be customized. Suitable for heavy-duty workshops, clean-room factories, and high-end commercial venues.
LANGUAN-KCC two-component epoxy colored sand self-leveling flooring is a 100% solid, solvent-free system with zero VOC, designed for eco-friendly, odor-free installation. It is formulated with high-performance epoxy resin, a special amine curing agent, and well-graded colored quartz sand, complying with GB/T 22374-2018.
High resistance to compression, flexural stress, and impact—built for heavy-duty, long-term forklift and equipment load;
A seamless monolithic surface helps prevent dust and bacteria accumulation. Strong adhesion to concrete, and resistant to acids, alkalis, salt, solvents, and machine oil—making it easy to maintain and clean daily;
Rich color options with smooth or lightly anti-slip finishes available. An optional conductive anti-static version can be customized.
Heavy-duty industrial areas: automotive workshops, logistics warehouses, hangars, and heavy machinery workshops;
High-standard clean rooms: electronics, pharmaceutical, food and beverage plants, and laboratories;
Premium commercial venues: shopping malls, exhibition halls, stadiums, airport terminals, and hotel lobbies;
Chemical-resistant zones: chemical plants, electroplating workshops, and chemical storage rooms.
Optimal flooring performance depends on a qualified substrate, accurate mixing ratio, and professional installation.
1. Substrate requirements: concrete strength ≥ C25; moisture ≤ 8%; flatness gap ≤ 3 mm under a 2 m straightedge. Grind, clean, and repair the concrete surface; apply a primer sealer for damp substrates.
2. Standard process: apply epoxy primer by roller → accurately mix Component A and Component B → pour and level the material → roll with a de-airing roller to remove bubbles → allow to self-level.
3. Environment & curing: install at 10–35 °C and RH < 80%. Keep the surface free from foot traffic for 24–48 hours; full load is permitted after 7 days. Do not apply in rainy or windy conditions.
4. Use a professional construction team. Ensure adequate ventilation and wear complete personal protective equipment (PPE) during installation.
If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.